Sunday, March 17, 2013

Paint, paint, and more paint

We have been working hard on the Crap Shack. This week we've been painting. We got the first coat up in the living room and the bathroom. It took a lot of time to find the right shade of green for the bathroom. I think it has turned out great.

The bathroom needs another coat, but so far so good.
The living room is taking shape
We have had one small snag recently. The tile for the kitchen floor. Sigh. We picked out one tile we really liked, but it was more than we wanted to spend. So we had a second choice, still a little more than we wanted to spend but that wasn't the kicker. It turned our the second choice for tile was a 4 week lead time. We are so close to being done, waiting 4 weeks for tile is not really an option. So it's back the drawing board. I have one lead I'm going to check out tomorrow during my lunch break. I'm sure if I work hard enough I can get something figured out. There's always a snag when you least expect it. So far those snags have lead to something awesome I wasn't expecting at all. I just need to find a little more house magic. Wish me luck!

No comments:

Post a Comment